With the eChiller cluster solution, it was possible to achieve chilled water production with maximum energy efficiency, as well as free cooling and partial redundancy. The smart control features enable a temperature accuracy of 1 K which has a direct impact on the quality of the cutting processes by the laser machines, and consequently also on the resulting products. This is essential, particularly for the exacting quality demands of the automotive industry.
The company has also been able to reduce its carbon footprint since Bluezero® inside does not produce any direct CO2 emissions during cooling. With water as the refrigerant, GEDIA has now also uncoupled itself from rising refrigerant prices and shortages.
An unusual feature of this solution is an “evaporator” which the customer has installed directly next to the container to provide pre-cooling using “waste low temperatures”. The laser cutting process requires gaseous nitrogen which is stored in liquid form in a tank directly next to the container. Evaporation via the heat exchanger generates approx. 9 kW of refrigeration in the from of evaporative cooling which the cooling system “cashes in on” and no longer needs to generate itself. This chilling – which is actually a “waste product” of the evaporation of the nitrogen – is thus used productively, allowing maximum energy efficiency.